
Add to Cart
2.1 Porosity defect is easily to form in the final solidification zone of the outer layer. More outer layer needs to be melted during the core filling. Cost will be increased as well as core feature be affected.
3.1 Iron liquid is spreading at a slow rate in the mould cavity. |